A

Court Farm, King George VI Avenue, Hove, BN3 6XJ

BH2021/03511

The agent has requested that the application be withdrawn.

C

Land to the East of Coldean Lane, North of Varley Halls, South of A27

BH2021/03525

Conditions 32 (affordable housing), 37 (overheating), 41 (activity equipment), and 42 (noise protection) have been discharged under reference no. BH2021/01616. Therefore they should now read as follows:

 

Condition 32:

 

The scheme for the provision of affordable housing shall be carried out in accordance with the accommodation schedule ref. 19099-HGP-XX-ZZ-SA-A-9501 approved under BH2021/01616. The affordable housing shall be provided in accordance with the approved scheme and shall meet the definition of affordable housing in Annex 2 of the National Planning Policy Framework or any future guidance that replaces it.

 

Condition 37:

 

The works shall be carried out in accordance with the Overheating Analysis Version 1 Rev A (PMC Construction, 27.04.2020) approved under BH2021/01616 and retained thereafter.

 

Reason: To create shade and reduce solar overheating and to comply with Policy CP8 of the Brighton & Hove City Plan Part One.

 

Condition 41:

 

The active play and learning equipment shall be provided in the equipped areas of play in accordance with the details approved under BH2021/01616 and shall be installed before the first occupation of the development or its completion, whichever is sooner.

 

Condition 42:

 

The works shall be carried out in accordance with the International Standard Method for Measurement of Airbourne Sound (Test Report No: 3464) approved under BH2021/01616. Each unit shall utilise a whole dwelling ventilation scheme incorporating suitable acoustic attenuation.

 

F

Rockwater, Kingsway, Hove

BH2021/03900

Letter of support received from Peter Kyle MP

 

Two (2) further comments received making the following points:

·         The huts in the proposed location cause congestion on the footway

·         The huts have not been designed to provide easy level access, can a ramped access solution be explored?